Skip to content

For the installer

Wiring diagrams

The wiring diagrams of the BGates devices. Installation is work on the electrical panel: it is done by an installer.

BGates AI 4G

Wiring diagrams

The most common uses, one diagram each. Tap a diagram to open it full size. The full specifications are on the BGates AI 4G page, all the steps in the full guide (PDF, 3.3 MB).

Before powering up

01

Power supply

L / N, 90–240 V AC.

02

Relay

C / NO / NC to the “start” or “pedestrian” input of the control unit, or directly to the load.

03

Antennas

The Bluetooth antenna is already fitted; the LTE antenna must always be screwed on, before powering up.

04

Mounting

On DIN rail, 4 modules (69 × 88 × 57 mm).

05

SIM

With the BGates SIM it is already inside: do not open the SIM holder. Your own SIM (VoLTE enabled) goes into the upper slot, standard size, chip facing down.

If you have a question about the wiring, write to info@bgates.it.